We are a global management consultancy that delivers exceptional outcomes and sustainable change

We are a global management consultancy that delivers exceptional outcomes and sustainable change

Case Studies

How a hospital optimized length of stay and communication

October 30, 2023 | Operational Excellence

Related Services

Related Industry

Share This Article

At a Glance

In a project with Renoir to improve patient throughput and reduce average length of stay, the following were the results upon completion:

  • Achieved targeted length of stay reduction before project completion
  • Positive revenue impact in excess of $3.8 million dollars during the project
  • Annualized bed capacity increase of 4327 additional bed days
  • Annualized revenue opportunity of $11.8 million

Background

The client is a top regional academic hospital in the United States, facing many challenges of similar healthcare providers – increased demand for services, facilities that are no longer adequate and supply costs that are excessive.

The Challenge

Renoir Consulting was engaged to lead a collaborative initiative to improve patient throughput and reduce the length of stay. Furthermore, the development of an institute-wide bed management and patient allocation strategy to best meet the needs of patients, physicians, nursing and ancillary staff was created.

What We Did

Renoir’s Analysis focused on the operational aspects that impact patient throughput, including the underlying operational, behavioral and systemic hurdles that existed. A solid and factual understanding of these areas would enable action plans to address opportunities and facilitate the drive towards improved length of stay.

Based on their findings and benchmarks, a number of opportunities were identified:

  • Management Control Systems not adequately controlling critical activities
  • Inadequate management performance system
  • Lack of focus on length of stay
  • Insufficient training to guide patient expectations and discharge
  • Patient placement process and planning

Implementation

The client and the Renoir team set out to analyze, map, identify gaps and implement changes in the overall processes, assigning a length of stay upon admission for their patient set (DRGs).

Some of these key areas and activities included: 

Focus on management of length of stay

A systematic process was established to ensure that length of stay guidelines were used to improve the planning of the patients stay upon their admission and monitoring the progress and improving the communication of the status of the patient to the whole patient care team. Benchmarks were established, used and tracked in relation to specific DRG’s to remove management of length of stay by “gut feel”.

Utilization of Milliman guidelines

Utilization of clinical, evidence based practice guidelines and discussed during discharge rounds to facilitate and document patient treatment milestones and ensure targeted LOS for optimal recovery. Additionally, the Milliman guideline tool ensures appropriate documentation capture to maximize reimbursement throughout the patients hospitalization.

Care management training and focus

Providing the Care Management and Social work functions with the requisite tools and training to facilitate the necessary changes.

Geographic placement of patients on dedicated floors

Focused efforts via Bed control, Bed co-ordination and the admitting function to aggregate patients admitted to a specific service on a dedicated service specific floor. Focus on improving the communication amongst the healthcare team, improving diagnosis specific care, assisting MD response time for clarification of patient issues, and overall benefit patient satisfaction.

Extended length of stay management

Enhanced focus on patients that remain longer than thirty days in the hospital. Development of a more proactive cultural shift and results orientated focus to deliver timely follow up to facilitate the patients discharge more appropriately.

Performance Management System

Measurement of performance to evaluate the effectiveness of process change. A structured system was developed to ensure targets to drive operational improvement were met, and a review mechanism was created to ensure performance was delivered and variance to targets was managed effectively.

Additional focus was placed on the following:

  • Key Performance Indicators (KPIs)
  • Overall hospital length of stay
  • Geographic patient assignment
  • DRG LOS performance
  • Case Mix Index (C.M.I.)
  • Extended LOS patient aggregate days
  • Visibility of performance

An integral part in driving performance was the posting of the results so that the departments and staff see the impact of the initiative. Displaying success reinforces positive behaviours and raises awareness that the efforts are reflected in improved performance.

Scorecard utilization

Utilizing a scorecard format enabled data to be presented in a coherent, structured and objective way. The inclusion and comparison against benchmark data assisted in the drive towards performance excellence. Using a dynamic measuring system allowed targets to be stretched and amended as each goal step was completed. It also allowed for corrective actions to be taken at shorter intervals.

Results

The results were significant, both in terms of the financial impact as well as the growth of the staff and the improved communication between all key stakeholders. Patient and staff satisfaction increased dramatically, proving that doing things right, benefits everyone

“The project has been a huge success. We have tackled a particularly tough hospital wide problem and with the help of Renoir have developed a model and engrained approach to ensure that length of stay and the management of patients’ throughput remains a strategic imperative. In addition to the delivered financial benefits, we have learned that operational efficiency, management of length of stay, and patient satisfaction are not mutually exclusive.”

– Chief Nursing Officer

Improve communication between stakeholders for an improved patient experience.

Further Reading

Operational Excellence

Case Studies

2024/12/10
Oil and gas company optimises project performance by streamlining KPIs

Operational Excellence

Case Studies

2024/12/05
Oil and gas operations achieves 82% increase in technician wrench time

Operational Excellence

Case Studies

2024/11/29
Asian utility achieves 23% increase in wrench time work

Operational Excellence

Case Studies

2024/08/27
Rotating Equipment Management Improves in LNG Plant

Operational Excellence

Case Studies

2024/08/27
Turnaround effectiveness improves for LNG plant with clarified KPIs

Operational Excellence

Case Studies

2024/08/15
Refinery reduces total maintenance downtime by 25%

Operational Excellence

Case Studies

2024/08/12
Oil refinery increases throughput by 34%

Operational Excellence

Case Studies

2024/08/09
Aviation fuel company reduces maintenance backlog by 28%