We are a global management consultancy that delivers exceptional outcomes and sustainable change

We are a global management consultancy that delivers exceptional outcomes and sustainable change

Case Studies

Mine Operations – Reducing Wait Time

January 6, 2022 | No related items found.

Related Services

Related Industry

Share This Article

Our client, one of the world’s leading mid-tier gold mining company.

Key Results

Loaders waiting for Trucks

4%

Improvement over the last 4 months

12%

Improvement over the last 4 weeks

Trucks waiting for Loaders

10%

Improvement over the last 4 months

16%

Improvement over the last 4 weeks

The challenge

In the pits we must carefully balance the number of trucks assigned to each Shovel (or “Loading Unit”). If the Shovel does not have enough Haul Trucks, it cannot be fully productive. If it has too many, then the Haul Trucks are not productive.

Rosebel’s Dispatch Office is where this balance of equipment is measured. The cycle of each Haul Truck is monitored in real-time from the location where it is loaded, the route it travels (roads and ramps), where it is dumping, and the return path to the next load. Dispatchers work with Mine Operations and Mine Planning to optimize these movements in a way that reduces traffic and waiting time for both fleets: the Loading Units and the Haul Trucks.

Operators, Supervisors and General Foremen communicate with Dispatchers throughout the shift to share information on road conditions, visibility and equipment maintenance considerations. Orchestrating this balance of fleets in a safe and efficient manner is truly a Team effort

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Further Reading

Operational Excellence

Case Studies

2024/12/10
Oil and gas company optimises project performance by streamlining KPIs

Organisational Effectiveness

Posts

2024/12/09
Increase Effectiveness through Organisational Design: The lifeblood of high-performance businesses

Business Transformation

Posts

2024/12/09
Transformations: How leaders can help drive successful implementations

Operational Excellence

Case Studies

2024/12/05
Oil and gas operations achieves 82% increase in technician wrench time

Organisational Effectiveness

Posts

2024/11/29
Addressing quiet quitting: A silent threat to organisational productivity

Business Transformation

Posts

2024/11/29
Achieve successful transformation through employee engagement

Operational Excellence

Case Studies

2024/11/29
Asian utility achieves 23% increase in wrench time work

Operational Excellence

Case Studies

2024/08/27
Permit to work compliance rises with Management Control System

Connect with us

Let us work with you to achieve exceptional results.