We are a global management consultancy that delivers exceptional outcomes and sustainable change

We are a global management consultancy that delivers exceptional outcomes and sustainable change

Case Studies

Processing Plant – Improvement Hard Rock Tons per Hour / Tons per Day

January 6, 2022 | No related items found.

Related Services

Related Industry

Share This Article

Our client, one of the world’s leading mid-tier gold mining company.

Key Results 

40%

Potential Improvement Hard Rock Tons per Hour at Gyratory Crusher

Optimizing our Process Plant begins with managing the sizes of the ore at the different stages of the process. This begins with the larger size ore being delivered by Haul Trucks from the mine to the very fine particle size required to recover the gold from the ore.

At the initial stage, the opening of the Gyratory Crusher was reduced from 6.0 inches to 4.5 inches. The opening at the Secondary Crusher was reduced to 1.5 inches. The Apron Feeder, another component early in the process, has been rebuilt increasing a tested capacity from 1,200 to 1,700 tons per hour. The repair on the tunnel also now enables the speed increase of the Apron Feeder from 65% to 75%.

In addition to the increased process capacity, less energy is required which reduces our costs and helps the environment.
Also, a refurbished rock breaker is currently being installed to reduce downtime and increase throughput.

Elements

  1. Managing the “F80” / size of ore feeding into the Plant
  2. Managing the CV2 conveyor (Hard Rock) and CV3 conveyor (Soft Rock)
  3. Replaced the Head Pulley for less slippage and less lagging
  4. Potential now to process daily demand of ore in 12 hours using two 777s and one 993LU for improved blending
  5. Refurbished rock breaker now being installed

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Further Reading

Operational Excellence

Case Studies

2024/08/27
Permit to work compliance rises with Management Control System

Operational Excellence

Case Studies

2024/08/27
Rotating Equipment Management Improves in LNG Plant

Operational Excellence

Case Studies

2024/08/27
Turnaround effectiveness improves for LNG plant with clarified KPIs

Operational Excellence

Case Studies

2024/08/15
Refinery reduces total maintenance downtime by 25%

Operational Excellence

Case Studies

2024/08/12
Oil refinery increases throughput by 34%

Operational Excellence

Case Studies

2024/08/09
Aviation fuel company reduces maintenance backlog by 28%

Operational Excellence

Case Studies

2024/08/05
Energy company reduces maintenance backlog by 70%

Operational Excellence

Case Studies

2024/08/02
Medical centre cuts delay, adds annual operating room hours by 5,500

Connect with us

Let us work with you to achieve exceptional results.